Fair and Congress Center Halle Münsterland

Münster, Germany
Foyer
Photo © Roman Mensing
Foyer
Photo © Roman Mensing
Foyer
Photo © Roman Mensing
Foyer
Photo © Roman Mensing
Congress Hall
Photo © Roman Mensing
Congress Hall
Photo © Roman Mensing
Congress Hall
Photo © Roman Mensing
Congress Hall
Photo © Roman Mensing
Architects
KRESINGS
Location
Albersloher Weg 32, 48155 Münster, Germany
Year
2017
Client
Messe und Congress Centrum Halle Münsterland GmbH
Technical Building Equipment
TIGEV Ingenieurgesellschaft mbh, Münster
Lighting Design
Dinnebier-Licht GmbH, Wuppertal
Structural Engineering
gantert + wiemeler ingenieurplanung, Münster
Fire Protection
W+W Sachverständige und Ingenieure für Brandschutz GmbH & Co. KG, Everswinkel
Building Physics
Graner + Partner Ingenieure GmbH, Bergisch Gladbach
Bauphysik
Graner + Partner Ingenieure GmbH, Bergisch Gladbach

The largest event center in the region of Münster consists of a large hall, three exhibition halls, the Congress Center and other auditoriums and lounges. Space program and structure as well as an elaborate event technology create a platform for multiple variable uses such as trade fairs, congresses and concerts.

In the last construction phase of the Halle Münsterland, the entire roof structure had to be renovated and the Congress Center, consisting of the foyer and the hall, had to be rebuilt.

Due to the winter snow loads that had to be considered, the load capacity of the flat roof was no longer sufficient. Therefore the old roof was completely removed and replaced by a new, more sustainable roof construction. On the one hand, the increased carrying capacity of the new tonneau roof means that snow loads will no longer be a problem. On the other hand, it allows more light and sound technology to be suspended from the ceiling.

Likewise, the Congress Hall and the foyer have been functionally and optically modernized, for which reason the MCC Halle Münsterland will meet future demands and expectations of an event center. The ceiling construction in the hall was renewed and a suspended ceiling was installed. In the foyer, a new room-side light ceiling with pyramid-shaped cones and roof domes for the use of daylight has been installed.

Furthermore, the flexible lighting and event technology is part of the new appearance. Highly efficient LEDs in the halls enable different lighting effects, visually enhance the interior of the building and are also responsible for energy savings.

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by KRESINGS

Autohaus Senger Oberursel
Oberursel, Germany
NINO-Hochbau Competence Center
Nordhorn, Germany
SoN – Center for Soft Nanoscience
Münster, Germany
Alexander-von-Humboldt-Comprehensive-School
Rüsselsheim a. M., Germany
SOS Children's Village
Düsseldorf-Garrath, Germany