DAS MINSK Kunsthaus, Potsdam

Potsdam, Germany
Insights into the building
Video © DAS MINSK Kunsthaus in Potsdam
THE MINSK Kunsthaus in Potsdam reopened in 2022 as a private art collection after extensive revitalization. The new building, based on a historical model, was built on the site of the former.
Photo © DAS MINSK Kunsthaus in Potsdam, Photo: Ladislav Zajac
The air in the café is directed through the filigree INDUL pine slot diffusers. The reliable free-flow characteristic prevents dirt deposits along the air diffuser, so ceilings stay clean for longer. Photo credit: DAS MINSK Kunsthaus in Potsdam, CAFÉBAR HEDWIG.
Photo © DAS MINSK Kunsthaus in Potsdam, Photo: Ladislav Zajac
The combination with the inductive air guide elements developed by Kiefer ensures that the air diffusers function almost silently - ideal for use in museum buildings. Photo credit: Ruth Wolf-Rehfeldt, Installationsansicht der Ausstellung Ruth Wolf-Rehfeldt: Nichts Neues, DAS MINSK Kunsthaus in Potsdam 2023, Courtesy Die Künstlerin und Chertlüdde.
Photo © DAS MINSK Kunsthaus in Potsdam, Photo: Ladislav Zajac
Displacement flow diffusers can be designed for ceiling, wall, sill and plinth installation, in flat construction, depending on the requirements. The installation was carried out between the luminous ceiling panels (luminous ceilings still in construction site mode - without tensioning foils below the diodes).
Photo © Kiefer Klimatechnik
Photo © Kiefer Klimatechnik
Manufacturers
Kiefer Klimatechnik GmbH
Location
Max-Planck-Straße 17, 14473 Potsdam, Germany
Year
2022
Client
Hasso Plattner Foundation
Team
Heinle Wischer Partnerschaft freier Architekten mbB, Ingenieurgesellschaft Scheel mbH

Art, culture and ventilation technology

The new MINSK Kunsthaus in Potsdam is one of the best-known revitalisation projects in the country. The new building based on a historical model was constructed on the site of the former "Minsk" terrace restaurant on the Brauhausberg. To protect the exhibits, ventilation technology with displacement air diffusers ensures a stable indoor climate and the most pleasant possible atmosphere for visitors.

After two years of renovation, the new MINSK Kunsthaus opened its doors to art and culture lovers in 2022. While the exterior cubature is still strongly reminiscent of the former GDR restaurant, the interior has been stripped back to the supporting structure and rebuilt - according to a design by the architects Heinle Wischer und Partner.

Requirements for technical building equipment set high standards

The ventilation and air-conditioning technology in particular required detailed planning in advance. This is because exhibition rooms are subject to conservation requirements; among other things, a stable room climate must be guaranteed in order to protect the works of art. At the same time, it is important to create a pleasant atmosphere of well-being for the museum public by providing an ideal draught-free room climate. Ingenieurgesellschaft Scheel, Berlin, is responsible for the technical building planning.

For example, INDUQUELL ceiling diffusers are installed throughout the exhibition rooms. Norbert Hinderer, sales engineer at Kiefer, explains: "With conventional displacement outlet systems, the supply air is fed into the rooms with low turbulence. Low air velocities in the usable area of the rooms are therefore characteristic. In contrast, INDUQUELL enables low room air velocities even at high temperature differences of up to -8 K. The combination with the inductive air guide elements developed by Kiefer also ensures that the air diffusers function almost silently - ideal for use in museum buildings."

Displacement air systems are predominantly developed individually for the building and tasks. INDUQUELL is designed here as a mixed air diffuser. The arrangement of the air outlets between the luminous ceilings of the exhibition rooms required a special design of the air distribution boxes. "Via an additional air scoop above the plenum box, a horizontal connection to the AHU ductwork could be made. The result was a reduction in the installation height for the air outlets and the air handling ductwork. Due to constraint points of the RLT duct network, the air scoops had to be mounted partly asymmetrically above the air distribution boxes," explains Hinderer.

Air flow investigation to evaluate air distribution and room acoustics

The indoor air flow was confirmed and validated by an external flow study at an early planning stage. In order to ensure that all technical building challenges were met and that disruptive influences could be evaluated or excluded, a laboratory test was carried out in Kiefer's own air flow laboratory. This involved testing and evaluating various perforated sheets with regard to optimum air distribution and confirming compliance with the required values for room acoustics. Subsequently, an elaborate ceiling sample field consisting of illuminated ceilings and air diffusers was created and final colour decisions were made. For the air diffusers, this resulted in the need for additional side panels in order to achieve a uniform overall appearance of the RLT installations next to the luminous ceilings.

The air supply for the café with adjacent roof terrace and for the staff rooms is provided by the INDUL linear diffuser. The filigree diffuser profiles fit into any desired ceiling architecture and keep ceilings dust-free for longer. Due to the specially developed discharge geometry, the supply air is split into fine alternating free jets, intensifying the induction of the room air. This in turn enables a very high temperature difference between room and supply air and, in particular, the use of free cooling. The required cooling capacity is reduced to a minimum and ensures a high energy-saving potential.

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by Kiefer Klimatechnik GmbH

Berlin´s Neue Nationalgalerie
Berlin, Germany
FHNW-Campus
Muttenz, Switzerland
Wagenhallen Stuttgart
Stuttgart, Germany
Lighthouse Hotel & Spa
Büsum, Germany
M9 Museum
Venice-Mestre , Italy