Lobby
Photo © Fantomas
Light Installation
Photo © Fantomas
Reception Desk
Photo © Fantomas

Office Building Oskar

 Terug naar projectenlijst
Locatie
Oskar-von-Miller-Ring 20, 80333 Munich, Duitsland
Jaar
2018
Klant
Hines
Team
Arnold / Werner Architekten
Signaletics and Light Installation
Fantomas

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Andere projecten van Arnold / Werner

Ferienhaus Urfeld
Urfeld, Duitsland
Hotel Stay2Munich
München, Duitsland
Bobbeaman Musicclub
München, Duitsland
Juwelier Fridrich
München, Duitsland
Wohnung Reitmorstraße
München, Duitsland