Photo © Mandi Halonen
Photo © Mandi Halonen
Photo © Mandi Halonen
Photo © Antti Laiho
Photo © Antti Laiho
Photo © Antti Laiho
Photo © Marc Goodwin

Metsa Group Headquarters

 Retour à la liste des projets
Lieu
Espoo, Finlande
Année
2016
Client
Metsa Group, Farmers´ Soacial Insurance Institution Company MELA
Équipe
Helin & Co Architects, Pekka Helin

Clad with exposed-aggregate panels in the typical manner of its time, the old three-volume office complex of the Metsätapiola real estate company had stood in south-eastern Tapiola in Espoo near the Länsiväylä thoroughfare from 1974. In summer 2009 the Metsäliitto co-operative, owner of the property, initiated a project for the renovation of the complex, covering the design and completion of a new office building as well as the renovation of the highest, eight-storey volume, especially as regards its facades and ground-floor spaces. The lower volumes were demolished and their part of the site was parcelled out for residential construction.

Tapiola is traditionally marked by a humane dialogue between architecture and nature. As an abstract metaphor of a birch forest, the facades of the new building were articulated by vertical sections bent in varying angles. This produces many variations in the interiors, spatial rhythms and views opening towards the sea.

Clerical work mainly takes place in open areas. Along with them, the needs of a modern, fluctuating work community are addressed by teamwork rooms, meeting rooms and rendezvous points. Daylight as an energy saving factor was given special attention. The open areas were grouped to face the sea, while the separate rooms were located to the courtyard side. Wood is an essential material in the office areas and meeting rooms as well as the exposed parts of furnishings. The new and old office spaces are connected by a one-storey-high restaurant-cum-function room, whose architecture is based on the top products of Metsäliitto’s own industrial businesses. The aim was to achieve a pillar-free space functionally as flexible as possible. The main supports are trestle structures with pillar elements of milled laminated wood and double beams of glulam wood. The interspace of each double beam has a window opening, the blank secondary sections are heat insulated wooden stressed skin panels. These components were all but finished when brought to site.

When the building was already in use, it appeared that there was a need for an auditorium bigger than the original one. Its design started in early 2015. The site had scanty area for additional building, but the solution was found in a broad fan-shaped room with sloping floor. The structures are mainly wood. The roof consists of stressed skin panels supported by one glulam principal beam and exterior walls. The wooden battening of the exterior cladding joins the facade to the function room of the main building that was completed earlier.

2015 Wood in Architecture Award shortlisted
2014 Fennia Prize honorary mention
2013 Iconic Awards Architecture winner

The building is LEED Gold 2013 certified

Autres projets de Helin & Co Architects

Alberga Area Centre (Music Hall, Regional Library, Commercial Centre)
Espoo, Finlande
Metsä Pavilion
Tokyo, Japon
Finnair Headquarters
Vantaa, Finlande
Skanssi Area Centre
Turku, Finlande
Eiranranta Housing
Helsinki, Finlande