Underground Tram Station Heddernheim
Frankfurt am Main, Germany
- Architects
- schoyerer architekten
- Location
- Frankfurt am Main, Germany
- Year
- 2006
- Photos
- gerhardkassner.de
The station was in need of a general renovation, as part of this process the main platform was raised to allow for disabled access.
The station lies between major traffic arteries, crossing the southern side of the station is the large Maybach Bridge, to the east lies a sport complex including an outdoor swimming pool. A public bus station forms the western boundary of the site; while to the west and north are a series of housing blocks.
It as clear from the beginning of the design, that only a large clearly defined form would be able to produce the desired presence in a complex and confusing urban mix. This response is similar to that of the American artist Donald Judd, who placed large cubic figures in a variety of environments. Unlike Judd this cubic form sits in slender columns and functions as both a roof and a “signal”. The roof intentionally pays reference to the city works as providers of energy and a modern transport system while also acting as a beacon for the many thousand of passengers who pass through the station every day.
The station roof is a combination of a primary structure of steel beams resting on irregularly placed columns. The irregularity of these columns allows for access by stairs to a pedestrian tunnel while also providing a free space at the nodal points of pedestrian traffic.
This primary structure is clad in industrial expanded Aluminium panels. Depending on the angle of view the roof appears as either transparent or closed and monolithic, if two oppositely adjacent panels are viewed simultaneously a moiré effect comes into play.
Behind the expanded Aluminium panels are a series of standard fluorescent lamps. These are programmed to respond to the movements to the trains on each platform. As a train approaches the station the colour of the light changes from yellow to orange, while the train is stationary the colour remains constant. Once the train begins to leave the station the light reverts back to a yellow tone. The opposing platform is similarly programmed with the light changing from blue to green. Additional colour changes are also possible.
On the city bound platform a new fully glazed kiosk with the character of a small shop has been built. This glass cube is protected at night with metal mash panels behind which are coloured metal offering additional protection and once again paying homage to the colour pallet of Donald Judd. The kiosk has a large cantilevered concrete roof, which provides a dry area between the platform and the Maybach Bridge. The main concrete wall of the kiosk is executed in black exposed concrete that surface has a hammer finish.
The renovated station has complete disabled access. Both platforms are reachable either by a pedestrian tunnel or by a protected over ground route underneath the Maybach Bridge.
Planning and construction time
2002-2006
Costs
1,6 Mio. EUR
Awards
Licht Architekturpreis 2005, Anerkennung
Renault Traffic Design Award 2005, Anerkennung
Related Projects
Magazine
-
Winners of the 5th Simon Architecture Prize
3 days ago
-
2024, The Year in …
5 days ago
-
Raising the (White) Bar
5 days ago
-
Architects Building Laws
1 week ago