National Museum of Qatar

Doha, Qatar
Photo © Andreas Keller, Altdorf
Photo © Andreas Keller, Altdorf
Photo © Andreas Keller, Altdorf
Photo © Andreas Keller, Altdorf
Photo © Andreas Keller, Altdorf
Engineers
Werner Sobek – Engineering, Design & Sustainability
Location
Doha, Qatar
Year
2019
Client
Qatar Museums Authority - Doha (Qat)
Architecture
Ateliers Jean Nouvel, Paris/France
Services by Werner Sobek
Consulting, site supervision building envelope | Full engineering and 3D detailed design and fabrication design secondary structure, primary steel structure and 3D FRC panels fixings | LOD400 BIM modeling of all components
Client
Hyundai Engineering & Construction Co., Ltd.

A new National Museum was constructed in the city of Doha as part of an on-going strategy to develop the Qatari capital into an international hub of finance, culture and tourism. The scale and geometric complexity of Jean Nouvel’s vision for the project made planning and installing the building envelope an extremely demanding task. The fundamental concept behind Jean Nouvel’s design was based on the rosette-like structures of the desert rose – a complex rock formation created by the evaporative crystallisation of gypsum in arid, sandy landscapes. Using this motif as a starting point, Nouvel developed a building complex with a footprint of approx. 400 m x 250 m and a maximum height of 40 m. The structure itself consists of 600 different discus-shaped components that intersect with one another. After consulting Jean Nouvel’s detailed architectural plan and call for tenders, the overall project was awarded to Hyundai, the Korean general contractor, at the end of 2011. A core element of the planning process was the BIM (Building Information Modelling) model into which all specialist planners and contractors involved in the project could continuously feed the results of their plans and designs. This model was the only way to handle the high geometric complexity of the project and avoid clashes between individual components. A software system from Gehry Technologies was used to manage the BIM model. Due to the scale of the project and the extremely high level of detail involved (LOD 400), it is currently the largest model of its kind in the world. One of the project’s particular challenges was dealing with the planning processes that needed to be carried out while construction was underway. The degree of overall coordination this required at all times necessitated the constant adaptation of the 3D BIM model for all trade disciplines and called for a highly efficient method of change management that used the most cutting-edge approaches and editing tools, such as automatic clash detection and the simplest possible parametrised procedure for tracking planning data. Werner Sobek was presented with the BIM Award 2016 for this innovative use of BIM technology.

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by Werner Sobek – Engineering, Design & Nachhaltigkeit

D10
Ulm, Germany
Active House B10
Stuttgart, Germany
Iset Tower
Ekaterinburg, Russia
adidas ARENA, World of Sports
Herzogenaurach, Germany
Heydar Aliyev Cultural Center
Baku, Azerbaijan