Fire Station in Straubenhardt
Straubenhardt, Germany
- Architects
- wulf architekten
- Location
- Langenalber Straße 67, 75334 Straubenhardt, Germany
- Year
- 2022
- Client
- Gemeinde Straubenhardt
- Team
- Julian Baun (PL), Milena Erdle, Alexander Jerosch-Herold, Daniela Scholz
- Projektsteuerung
- FRANKE BAUR Ingenieurgesellschaft mbH, Baden-Baden
- Project management
- FRANKE BAUR Ingenieurgesellschaft mbH, Baden-Baden
- Construction management
- 2plus Baumanagement GmbH, Stuttgart
- Structural engineering
- f2k ingenieure gmbh, Stuttgart
- Landscape design
- Ramthun Landschaftsarchitektur, Baden-Baden
- Building physics
- Hüttinger Bauphysik, Lehrensteinsfeld
- Awards
- Fritz-Bender-Baupreis 2022, DAM Preis 2023 (Longlist), Hugo-Häring-Auszeichnung 2023 BDA Nordschwarzwald
The new fire station brings together six previously independent firefighting units at one strategically located site on Langenalberstraße. The project was designed with the goal of implementing circular construction and sustainable planning in accordance with the “Cradle to Cradle” principle.
The separation and stacking of the individual functional levels and the use of the site’s sloping terrain are part of the fundamental design concept. As a result, the sealed soil surface could be minimized and, moreover, the building structure nestles harmoniously into the topography. The massive concrete plinth is cut into the slope and the north-facing facade opens to the street. Inside are the garage for the firefighting vehicles and all the facilities required for operations, as well as storage and technical areas. The open-air intermediate level has two atriums and captures the surrounding landscape. It is reached along an external ramp and serves as a parking deck as well as an area for events. Raised up above this is a wooden structure that is wrapped in a homogeneous facade of white expanded metal. It accommodates a classroom, office areas, and other shared spaces. The stacking of the different functional zones is clearly recognizable from the outside, creating a distinctive appearance that establishes a strong identity.
By using recyclable materials that are low in harmful substances and can be easily separated and reused when dismantled, the building is a valuable raw material supplier and future material resource. The new fire station, one of the first Cradle to Cradle buildings in all of Germany, is a trailblazing building whose exemplary character acts as an important stimulus for future developments.
Related Projects
Magazine
-
It Was Fifty Years Ago Today...
2 days ago
-
‘Every Building Tells a Story’
3 days ago
-
Scaffolding Comes Down at LACMA
4 days ago
-
A Horned Cube for Oleotourism
5 days ago