University of California Merced: Central Plant Complex and Information-Technology Center

Merced, USA
Foto © Tim Griffith, courtesy of SOM
Foto © Tim Griffith, courtesy of SOM
Foto © Tim Griffith, courtesy of SOM
Foto © Tim Griffith, courtesy of SOM
Foto © Tim Griffith, courtesy of SOM
Architekten
Skidmore, Owings & Merrill
Standort
Merced, USA
Jahr
2005

This complex is part of the first phase of a new university campus for the state of California. In addition to providing power for the university’s first-phase buildings, the plant also plays a key role in achieving the ambitious sustainable design goals outlined by the Board of Regents—20 percent lower than any existing campus in the system and a campus-wide Silver LEED™ rating.  The exterior walls of the plant and tank are sheathed in an outer layer of corrugated metal panels similar to the ubiquitous grain silos, farm sheds, semi-trucks, and freight cars found in the valley. The finish of the stainless steel panels captures and reflects the entire spectrum of the brilliant Central Valley summer sun.

Dazugehörige Projekte

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazin

Andere Projekte von Skidmore, Owings & Merrill

Pearl River Tower
Guangzhou, China
Diagonal Tower
Seoul, Süd-Korea
Poly Real Estate Headquarters
Guangzhou, China
Chhatrapati Shivaji International Airport, Terminal 2
Mumbai, Indien
Cathedral of Christ the Light
Oakland, USA