Office Building Oskar
Munich, Germany
- Architects
- Arnold / Werner
- Localització
- Oskar-von-Miller-Ring 20, 80333 Munich, Germany
- Any
- 2018
- Client
- Hines
- Equip
- Arnold / Werner Architekten
- Signaletics and Light Installation
- Fantomas
In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.
Projectes relacionats
Revista
-
Winners of the 5th Simon Architecture Prize
hace 4 dies
-
2024, The Year in …
hace 5 dies
-
Raising the (White) Bar
hace 6 dies
-
Architects Building Laws
hace 1 setmana