Google Bay View

Mountain View, CA, USA
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Photo © Iwan Baan
Drawing © Heatherwick Studio
arkkitehdit
BIG – Bjarke Ingels Group
Location
Mountain View, CA, USA
Year
2022
Client
Google
Team
Bjarke Ingels (Partner-in-charge), Beat Schenk (Partner-in-charge), Daniel Sundlin (Partner-in-charge), Leon Rost (Partner-in-charge), Thomas Christoffersen (Partner-in-charge), Blake Smith (Project Leader), Ryan Harvey (Project Leader), David Iseri (Project Leader), Florencia Kratsman (Project Leader), Linus Saavedra (Project Manager), Ziad Shehab (Project Manager), Agla Egilsdottir, Alessandra Peracin, Ali Chen, Andriani Atmadja, Alvaro Velosa, Armen Menendian, Benjamin Caldwell, Benson Chien, Bernard Peng, Brian Zhang, Camilo Aspeny, Cheyne Owens, Christopher Wilson, Claire Thomas, Cristian Lera, Cristina Medina-Gonzalez, Danielle Kemble, David Spittler, Deborah Campbell, Derek Wong, Diandian Li, Dylan Hames, Erik Kreider, Eva Maria Mikkelsen, Guillaume Evain, Hacken Li, Helen Chen, Isabella Marcotulli, Isela Liu, Jason Wu, Jennifer Dudgeon, Jennifer Kimura, Jennifer Wood, Jeremy Siegel, Jia Chengzhen, Ji-Young Yoon, Jian Yong Khoo, John Hilmes, Jonathan Fournier, Joshua Plourde, Julien Beauchamp-Roy, Kalina Pilat, Kiley Feickert, Kurt Nieminen, Lina Bondarenko, Mads Kjaer, Manon Otto, Marcus Kujala, Maria Acosta, Meghan Bean, Michelle Stromsta, Nandi Lu, Nicole Passarella, Olga Khuraskina, Oliver Colman, Otilia Pupezeanu, Patrick Hyland, Peter Kwak, Ramona Montecillo, Rita Sio, Sebastian Claussnitzer, Sebastian Grogaard, Seo Young Shin, Shu Zhao, Siva Sepehry Nejad, Terrence Chew, Thomas McMurtrie, Tiago Sa, Timothy Cheng, Tingting Lyu, Valentino Vitacca, Vincenzo Polsinelli, Walid Bhatt, Yesul Cho, Yina Moore
Design Architects
BIG-Bjarke Ingels Group, Heatherwick Studio
Development Group
Sares Regis
Executive Architect
Adamson
Interior Architect
STUDIOS
Events Consultant
Populous
Structural Engineer
Thornton Tomasetti
MEP/FP Engineer
Integral Group
Landscape Architect
Olin
Acoustic Consultant & Facade Engineers
ARUP
Civil Engineer
BKF
Water Engineer
Sherwood
Fire & Life Safety
Holmes
Geotechnical Engineer
Kleinfelder
Daylighting Consultant
Loisos + Ubbelohde
Lighting Consultant
FMS
Access & Maintenance
C.S. Caulkins Co
Telecommunications
Teecom
General Contractor
Whiting-Turner
Signage & Wayfinding
Applied Wayfinding
Sustainability & LEED Consultant
A10

Designed by BIG-Bjarke Ingels Group and Heatherwick Studios in close collaboration with Google, Bay View is Google’s first-ever ground-up campus with the mission to operate on carbon-free energy, 24 hours a day, seven days a week by 2030. The buildings deliver on Google’s ambition to create human-centric, sustainable innovations for the future of Google’s workplace as well as scalable, replicable solutions for the construction industry and beyond.

Located on a 42-acre site at the NASA Ames Research Center in Silicon Valley, the Google Bay View Campus, consisting of three buildings, totals 1.1 million sq ft – including 20 acres of open space, two workspace buildings, a 1,000-person event center, and 240 short-term employee accommodation units. All three buildings are constructed as lightweight canopy structures optimized for interior daylight, views, collaboration, experiences and activities.

Bay View’s three new buildings are part of Google’s ambition to be the first major company to operate on carbon-free energy, 24 hours a day, seven days a week by 2030. The site is expected to achieve a LEED-NC v4 Platinum certification and become the largest facility ever to attain the International Living Future Institute (ILFI) Living Building Challenge (LBC) Water Petal Certification.

Anchored in three themes defined by Google’s design brief at the beginning of the project – innovation, nature, and community – the design is driven by flexibility and extraordinary user experience that inspires collaboration and co-creation. Team spaces are on the upper level and gathering spaces are below, separating focus and collaborative areas while still providing easy access to both. The second floor design has variation in floorplates to give teams a designated “neighborhood” area that is highly flexible to change with their needs.

The Bay View Buildings are split across only two floors, with desks and team spaces on the upper level, and the amenity spaces below. A series of indoor “courtyards” throughout the buildings connect the two levels, giving teams easy access to cafes, kitchenettes, conference rooms, and all-hands spaces. The courtyards also encourage the physiological benefits of physical movement when circulating between levels and different modes of work, and double as wayfinding devices.

Above, the large-span canopy with average orthogonal column spans allows the entire second-level workspaces to be open and connected under one roof. These workspaces prioritize access to natural light and views, with reduced glare through carefully designed clerestory windows punctuating the canopy.

Rather than being segmented by excessive columns and support walls, the structural innovation of the canopy roof allows for a wide-open workspace; every person has equal access to views across the floorplate, and through the perim­eter facade and clerestory windows to the outdoors. On the exterior, all three buildings feature a first-of-its-kind “dragonscale” solar skin roof equipped with 50,000 silver solar panels that generate a total of nearly seven megawatts of energy.

This canopy superstructure applied across all the buildings is the result of a multi-year effort to achieve the most functional, energy-efficient, and economical building solution: a net system made of tubular steel with simple clerestory windows between the canopy bays and an opaque roof structure offers the best acoustic control, minimizes thermal heat gain, lower overall energy loads, and allows Google to harvest the maximum amount of solar PV on the outside. It also provides daylight to the workspaces inside without excessive glare, allowing every desk in the building to have views of the outside, and access to daylight throughout most of the day.

Bay View operates entirely on electric energy and the campus houses the largest geothermal pile system in North America, estimated to reduce carbon emissions by almost 50% and water used for cooling by 90%. In addition, on-site systems built by Google collect, treat, and reuse all stormwater and wastewater and provide habitat restoration, sea level rise protection, and access to the beauty of natural wetlands for both Googlers and the public on the nearby Bay Trail.

Bay View is also a Living Building Challenge (LBC) water-positive campus and on track to be the largest project ever certified by the International Living Future Institute (ILFI) under any of its programs, which are recognized as the most ambitious regenerative building rating systems in the world.

Google’s mission to unlock advancements for the benefit of the entire industry have led to several scalable solutions in working on the Bay View campus: increasing modular construction, geothermal at new scales, innovation in PV design, a permitted blackwater system, waste diverted from landfill, improved total number of products vetted for Red List ingredients, and landscape designed to advance water stewardship and create valuable habitat for threatened wildlife.

Overall, the Google Bay View campus has forged a new frame­work, materials language, and ecological approach that will help push both the future of the workplace, and the built environment-at-large, forward.

Related Projects

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressiver Reinraumausbau
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Magazine

Other Projects by BIG – Bjarke Ingels Group

CapitaSpring
Singapore
Glasir – Tórshavn College
Tórshavn, Faroe Islands, Denmark
Copenhill
Copenhagen, Denmark
Hualien Residences
Hualien, China
S.Pellegrino Flagship Factory
San Pellegrino Terme, Bergamo, Italy